Shanghai World Financial Center

Source:fegroup Published: 2017-11-04 Hits:

Currently, as landmark buildings of cities, super high-rise structures have become symbols of urban modernization. However, it cannot be denied that constructing such buildings is no easy feat; due to their nature, they are expensive to build and functionally complex, and because they accommodate a large number of people, the requirements for safety and security are extremely high, far exceeding those of ordinary high-rise buildings. Taking the Shanghai World Financial Center as an example, as a landmark building in Shanghai at that time, with a height of 492 meters, it became the tallest building in Shanghai and was rated by the Council on Tall Buildings and Urban Habitat (CTBUH) as the "Best Tall Building of the Year". In 2018, ten years later, it also received the "16th Annual Global High-rise Award - 'Decade Special Award'" from CTBUH.

The installation of cables in such super high-rise buildings poses very high demands on both the quality of the cables and the installation plans, which can even be described as stringent. Facing these challenges, Far East Cable Co., Ltd., under Far East Smart Energy Co., Ltd. (referred to as: Far East Shares, Stock Code: 600869), through continuous research and innovation, independently developed super high-rise vertical laying cables and lifting equipment, successfully applied in the Shanghai World Financial Center, breaking foreign technological monopolies and achieving complete independent research and development, design, production, and delivery. To date, it has been running safely for 13 years, becoming the best testament to the quality of Far East Cable's super high-rise building cables.

High Construction Difficulty and Technical Gaps

Cables, as the "blood vessels" of buildings, are indispensable, continuously supplying power to the building's power core, so their safety and stability are critical. Especially for super high-rise buildings like the Shanghai World Financial Center, their importance is self-evident. Once a cable problem occurs, unimaginably serious consequences could result.

Compared to general high-rise buildings, super high-rises have higher requirements for electrical design. For example, the small space of vertical shafts for cable installation increases the difficulty of installation, and the heavy weight of the cables themselves may cause damage during long-distance vertical installations, making long-term safety uncertain. These all become pain points in cable design and construction. At the same time, the technology for hoisting cables in super high-rises was controlled by Japanese companies, leaving a technical gap in China's cable industry. At that time, the investor, Mori Building Company, chose Fujikura's technology and decided to import this batch of 10kV hoisting cables from Japan.

Overcoming Difficulties and Breaking Technological Monopolies Through Innovation

So how did Far East Cable overcome this technical bottleneck and break the Japanese monopoly? It relied on innovation and an indomitable spirit. The founder of Far East Holdings Group, Chairman of the Board, Party Secretary Jiang Xipei once vowed: Landmark buildings standing on Chinese soil must use our own country's cables. Guided by this belief, the Far East Cable technology team, based on power supply design requirements, broke through traditional lifting methods, reduced the weight of the cable itself, improved bending performance, and other technologies, overcoming difficulties one after another, successfully developing super high-rise vertical laying cables and lifting equipment, passing comprehensive performance tests, and ultimately gaining recognition from the investors and constructors of the Shanghai World Financial Center. Among them, the longest cable was 708 meters long, weighing 14 tons, lifted from 131 meters to over 400 meters, passing through underground horizontal sections, vertical sections, and upper-level horizontal sections, which was unprecedented in domestic super high-rise vertical laying construction at that time.

Compared to traditional steel wire-armored cables, the super high-rise vertical laying cables developed by Far East Cable increase the current carrying capacity by about 10-30%, reduce the weight of the cable by 20-30%, and have no intermediate joints throughout the entire cable, greatly enhancing conductivity and safety. Additionally, the vertical section of the cable uses a self-supporting unit, embedding three steel ropes into the vertical segment of the cable and equipping it with a lifting plate. During the lifting process and long-term operation, the steel ropes and lifting plates bear the load, ensuring support regardless of length or weight, effectively guaranteeing the safety of the building's power system.

During installation, the cables hang vertically in the shaft without requiring a bridge rack, equipped with special lifting devices for installation, compact structure, occupying less space, providing safe and reliable load-bearing. This not only effectively solves the installation problems but also saves installation costs and improves overall economic efficiency. Moreover, the cables adopt environmentally friendly designs, featuring excellent halogen-free, flame-retardant, fire-resistant, low smoke emission, and low heat release properties, achieving green, safe, environmentally friendly, intelligent, and economical power distribution for buildings.

Improving Standards and Filling Technical Gaps

Innovation knows no bounds. Through continuous exploration and R&D, Far East Cable has gradually established a complete set of installation standards, serving as the main editor of the "Super High-rise Vertical Laying Cable and Lifting Equipment" group standard of the Architectural Society of China, filling the gaps in industry standards, which holds significant guiding significance for the future development of super high-rise buildings and provides "protection" for the safe operation of many super high-rise buildings, such as CITIC Tower.

For the special situation requiring the continuous safe arrangement of twelve cables within a 450mm wide electrical shaft, Far East Cable created several "world firsts", including an 820-meter special 10kV high-voltage suspended cable laying and a dual-lift plate lifting device, among others, laying a total of 24 suspended cables, totaling 15,132 meters in length and weighing 136.38 tons, ensuring the safe operation of CITIC Tower.

Over the years, Far East Cable has always focused on the design, R&D, production, and sales of smart cable products in the construction sector, actively serving the intelligent development of super high-rise buildings, leading major changes in power supply methods for super high-rises, and contributing Far East technology and solutions to the development of super high-rise buildings.

主站蜘蛛池模板: 在线人成视频播放午夜福利 | 巨胸美乳无码人妻视频| 深夜福利啪啪片| 免费无码一区二区三区蜜桃| 国产999精品成人网站| 国产av国片精品jk制服| 自拍亚洲一区欧美另类| 日韩精品亚洲色大成网站| 欧美又粗又大aaa片| 黄色视频网站免费| 欧美亚洲高清国产| 无码av片av片av无码| 亚洲成av人片无码迅雷下载| 亚洲国产精品高清久久久| 色欲av巨乳无码一区二区| 欧美成人午夜性视频| 日韩精品久久久肉伦网站| 天天澡天天揉揉av无码| 免费无码又爽又刺激高潮软件| 亚洲国产高清在线一区二区三区| 国产免费网站看v片在线无遮挡 | 亚洲一区二区三区在线观看精品中文 | 夜夜夜高潮夜夜爽夜夜爰爰| 亚洲综合av在线在线播放| 理论片午午伦夜理片2021| 日本少妇高潮喷水视频| 少妇人妻av无码专区| 日本不卡三区| 欧美孕妇xxxx做受欧美88| 久久精品国产亚洲a∨麻豆| 国产乱子伦一区二区三区视频播放 | 亚洲欧美人成视频一区在线| 无码av天天av天天爽| 亚洲欧洲无码一区二区三区| 性色av一区二区三区咪爱四虎| 国产av仑乱内谢| 内射无码专区久久亚洲| 成人国产一区二区精品| 免费人妻无码不卡中文18禁| 巨胸喷奶水视频www免费网站| 亚洲精品综合一区二区三|